West Jordan, Utah Building Permits
Navigate the West Jordan, Utah building permit process with ease. Learn about requirements, timelines, fees, and local codes for your next construction project.
Wind
ASCE 7 basic wind speed: 115 mph (3-second gust).
Snow Load
Ground snow load: 30 psf.
Flood
Primarily outside of special flood hazard areas, with minimal zones along the Jordan River.
Earthquake
Seismic Design Category D.
Wildfire
Low risk; standard building codes apply.
Building Department
West Jordan City Community Development Department
Approval Timeline
Residential: 10-15 business days; Commercial: 20-30 business days.
Common Requirements
Site plan, floor plans, elevations, structural framing plans, and energy code compliance forms.
Zoning Information
Utilizes a land use ordinance divided into residential, commercial, and industrial zones. Check the interactive GIS map.
Permit Costs
Based on project valuation; typically ranges from $500 for small additions to several thousand for new homes.
Engineering Requirements
Stamped structural engineering plans are required for all new construction and major structural modifications.
Local Code Adoption
2018 International Building Code (IBC) and International Residential Code (IRC).
Typical Projects
Basement finishes, detached garages, home additions, and deck construction.