Orem, Utah Building Permits

Everything you need to know about building permits in Orem, Utah. Get details on local code adoption, permit costs, and the application process today.

Wind

ASCE 7 basic wind speed: 115 mph.

Snow Load

Ground snow load: 35 psf.

Flood

Most of Orem is not in a flood hazard zone; refer to FEMA FIRM maps for exceptions.

Earthquake

Seismic Design Category D.

Wildfire

Generally low risk, but wildland-urban interface codes may apply to foothill properties.

Building Department

Orem City Development Services

Approval Timeline

Residential: 2 weeks; Commercial: 4-6 weeks for initial review.

Common Requirements

Detailed plot plan, structural drawings, HVAC layouts, and proof of utility connections.

Zoning Information

Orem uses a variety of zones; verify your property zoning via the Orem City zoning map before design.

Permit Costs

Fees are calculated per the city's adopted fee schedule based on project square footage and valuation.

Engineering Requirements

Required for all structural modifications, footings, and complex site grading.

Local Code Adoption

2021 International Building Code (IBC) and International Residential Code (IRC).

Typical Projects

Basement finishing, kitchen remodels, window replacements, and patio covers.

Frequently Asked Questions

Orem Permit Quote

Get a permit package tailored to Orem's specific requirements.

Common Permit Problems in Orem

Browse guides for ADUs, after-the-fact permits, decks, and more — with complete permit packages.