Orem, Utah Building Permits
Everything you need to know about building permits in Orem, Utah. Get details on local code adoption, permit costs, and the application process today.
Wind
ASCE 7 basic wind speed: 115 mph.
Snow Load
Ground snow load: 35 psf.
Flood
Most of Orem is not in a flood hazard zone; refer to FEMA FIRM maps for exceptions.
Earthquake
Seismic Design Category D.
Wildfire
Generally low risk, but wildland-urban interface codes may apply to foothill properties.
Building Department
Orem City Development Services
Approval Timeline
Residential: 2 weeks; Commercial: 4-6 weeks for initial review.
Common Requirements
Detailed plot plan, structural drawings, HVAC layouts, and proof of utility connections.
Zoning Information
Orem uses a variety of zones; verify your property zoning via the Orem City zoning map before design.
Permit Costs
Fees are calculated per the city's adopted fee schedule based on project square footage and valuation.
Engineering Requirements
Required for all structural modifications, footings, and complex site grading.
Local Code Adoption
2021 International Building Code (IBC) and International Residential Code (IRC).
Typical Projects
Basement finishing, kitchen remodels, window replacements, and patio covers.