Salt Lake City, Utah Building Permits
Navigate building permits in Salt Lake City, UT easily. Our comprehensive guide covers approval timelines, local codes, fees, and requirements for your project.
Wind
ASCE 7 basic wind speed: 115 mph
Snow Load
Ground snow load: 30 psf
Flood
Varies by location; consult FEMA FIRM maps for specific parcel flood hazard status.
Earthquake
Seismic Design Category D
Wildfire
Wildland-Urban Interface code requirements apply to foothills and mountainous districts.
Building Department
Salt Lake City Building Services Division
Approval Timeline
Residential: 2-4 weeks; Commercial: 6-10 weeks depending on complexity.
Common Requirements
Site plan, floor plans, structural details, energy compliance reports, and proof of contractor licensure.
Zoning Information
Utilizes a comprehensive zoning map with specific residential, commercial, and mixed-use districts defined in the city code.
Permit Costs
Fees are based on project valuation; typically range from $500 to $5,000 for standard residential additions.
Engineering Requirements
Required for structural alterations, unconventional designs, or any work impacting the building load-bearing integrity.
Local Code Adoption
2021 International Residential Code (IRC) and International Building Code (IBC).
Typical Projects
Basement finishes, deck additions, residential remodels, and commercial tenant improvements.