Provo, Utah Building Permits
Get your Provo building permits approved quickly. Our guide provides details on local zoning, code compliance, building department contacts, and fee structures.
Wind
ASCE 7 basic wind speed: 115 mph
Snow Load
Ground snow load: 35 psf
Flood
Consult Provo's official flood hazard maps; specialized zones exist near the Provo River.
Earthquake
Seismic Design Category D
Wildfire
Wildland-Urban Interface requirements apply to high-elevation properties near the mountains.
Building Department
Provo City Building Inspection Division
Approval Timeline
Residential: 15 business days; Commercial: 45-60 days.
Common Requirements
Structural calculations, plumbing/electrical plans, site survey, and building envelope details.
Zoning Information
Uses a specific 'Provo City Code' zoning system; check the city's geographic information system (GIS) for zone designations.
Permit Costs
Fees are calculated using a sliding scale based on project valuation and type of construction.
Engineering Requirements
Licensed Utah engineer stamps are required for all structural plans and soil reports.
Local Code Adoption
2021 International Building and Residential Codes.
Typical Projects
Multi-family housing, student housing upgrades, and residential kitchen/bathroom remodels.