Virginia Beach, Virginia Building Permits
Navigate building permits in Virginia Beach, VA. Learn about city requirements, approval timelines, fee structures, and local building codes for your project.
Wind
ASCE 7 basic wind speed: 110-115 mph (Coastal Design Requirements apply)
Snow Load
Ground snow load: 15 psf
Flood
High susceptibility to flood; elevation certificates are mandatory for construction in Special Flood Hazard Areas.
Earthquake
Seismic Design Category B
Wildfire
Low risk; standard building code compliance applies for exterior materials.
Building Department
Virginia Beach Planning and Community Development - Permits and Inspections
Approval Timeline
Residential permits typically take 10-15 business days; commercial projects often require 20-30 business days depending on complexity.
Common Requirements
Signed permit application, site plan, construction drawings (floor plans, framing details), and proof of contractor licensing.
Zoning Information
City operates under a comprehensive zoning ordinance with specific overlay districts, especially regarding coastal and Chesapeake Bay protection.
Permit Costs
Fees are calculated based on the total cost of construction; minimum fees start around $75 plus state levies.
Engineering Requirements
Professional engineer or architect stamps are required for structural modifications, commercial buildings, and non-prescriptive residential designs.
Local Code Adoption
2018 Virginia Uniform Statewide Building Code (USBC)
Typical Projects
Deck additions, kitchen remodels, shed installations, and coastal home renovations.