Hampton, Virginia Building Permits
Learn the building permit process in Hampton, Virginia. Access department contact info, approval timelines, fee structures, and local code requirements here.
Wind
ASCE 7 basic wind speed: 110-115 mph (Risk Category II)
Snow Load
Ground snow load: 20 psf
Flood
Located in a coastal region; specific FEMA Flood Insurance Rate Maps apply to many waterfront properties.
Earthquake
Seismic Design Category B
Wildfire
Low risk; standard Virginia Uniform Statewide Building Code requirements apply.
Building Department
Hampton Community Development Department
Approval Timeline
Residential permits typically take 5-10 business days for standard projects. Commercial projects often require 15-30 business days depending on complexity.
Common Requirements
Complete building permit application, three sets of construction drawings, site plan showing property lines, and proof of contractor licensing.
Zoning Information
Hampton utilizes a zoning ordinance that divides the city into residential, commercial, industrial, and maritime districts to regulate land use.
Permit Costs
Fees are calculated based on the total cost of construction and square footage; residential permits generally start at $75 plus associated trade fees.
Engineering Requirements
Engineer or architect stamps are required for all commercial structures and residential projects involving structural modifications or non-prescriptive design.
Local Code Adoption
2018 Virginia Uniform Statewide Building Code (VUSBC)
Typical Projects
Residential additions, kitchen/bath remodels, detached garages, and coastal flood zone elevation projects.