Madison, Wisconsin Building Permits

Applying for a building permit in Madison, WI? Get essential information on the Building Inspection Division process, fees, codes, and project timelines today.

Wind

ASCE 7 basic wind speed: 90-105 mph

Snow Load

Ground snow load: 40 psf

Flood

Subject to Yahara River and lake shore floodplain regulations; verify via FEMA maps.

Earthquake

Seismic Design Category A

Wildfire

Low risk; standard fire-resistive materials required by code.

Building Department

Madison Building Inspection Division

Approval Timeline

Residential projects average 1-2 weeks; commercial projects typically require 4-6 weeks for initial review and corrections.

Common Requirements

Completed application, detailed floor plans, structural details, energy calculations, site map, and Erosion Control Plan if applicable.

Zoning Information

Madison utilizes a unified development code (UDC) with districts including Residential, Commercial, Downtown, and special overlay districts.

Permit Costs

Permit fees are fee-schedule based. Expect base fees plus per-square-foot costs for new construction or additions.

Engineering Requirements

Engineers' stamps are required for all commercial work, residential structural work, and any projects involving complex foundation or lateral force systems.

Local Code Adoption

Adopts Wisconsin Uniform Dwelling Code (UDC) and IBC 2015/2021 amendments.

Typical Projects

ADUs, residential additions, deck replacements, multi-family construction, and sustainable retrofits.

Nearby Cities in Wisconsin

Frequently Asked Questions

Madison Permit Quote

Get a permit package tailored to Madison's specific requirements.

Common Permit Problems in Madison

Browse guides for ADUs, after-the-fact permits, decks, and more — with complete permit packages.

Led by Licensed Engineers

Ready to Permit in Madison?

Our team knows Madison building codes and permit requirements. Call (888) 257-8440 for a free quote.