Cheyenne, Wyoming Building Permits
Navigate building permits in Cheyenne, WY easily. Learn about the permit process, required documents, approval timelines, and local codes for your projects.
Wind
ASCE 7 basic wind speed: 115-120 mph
Snow Load
Ground snow load: 30 psf
Flood
Participates in NFIP; flood zones determined by FEMA FIRM maps.
Earthquake
Seismic Design Category: B
Wildfire
Low to moderate urban-interface risk; standard residential fire safety codes apply.
Building Department
City of Cheyenne Building Safety Division
Approval Timeline
Residential permits typically take 7-14 business days, while complex commercial projects can require 3-6 weeks depending on department workload.
Common Requirements
Site plan, floor plans, foundation details, energy code compliance, and structural framing sections are generally required for new construction.
Zoning Information
Cheyenne utilizes a Unified Development Code (UDC) to govern land use, density, and setback requirements across various residential and commercial zones.
Permit Costs
Fees are generally calculated based on valuation of the project, with residential fees ranging from $500 to $3,000 for standard additions or builds.
Engineering Requirements
Engineered stamps are required for all commercial projects, structural changes, foundation modifications, and non-standard framing designs.
Local Code Adoption
2021 International Building Code (IBC) and International Residential Code (IRC)
Typical Projects
Single-family residential additions, detached garages, commercial retail tenant improvements, and deck construction.