Arlington, Virginia Building Permits

Get all the information you need for building permits in Arlington, Virginia. Learn about current code adoptions, fees, and the local permit application process.

Wind

ASCE 7 basic wind speed: 115 mph

Snow Load

Ground snow load: 25 psf

Flood

Portions of Arlington are located in 100-year flood zones; flood-resistant construction standards apply.

Earthquake

Seismic Design Category B

Wildfire

Very low risk; focus is primarily on building code compliance regarding fire resistance.

Building Department

Arlington County Inspection Services Division

Approval Timeline

Residential permits take 10-15 business days; commercial permits often require 30-45 business days for initial review.

Common Requirements

Plats of survey, detailed construction drawings, energy code compliance documentation, and completed permit application forms.

Zoning Information

Arlington uses a complex zoning ordinance with various 'R' (residential) and 'C' (commercial) districts, frequently involving site plan requirements for larger developments.

Permit Costs

Fees are based on a combination of fixed administrative costs and variable charges tied to project value and the volume of inspections required.

Engineering Requirements

Structural, mechanical, electrical, and plumbing engineering stamps are required for all commercial work and residential structural changes.

Local Code Adoption

2018 Virginia Uniform Statewide Building Code

Typical Projects

High-density residential development, kitchen remodels, basement dig-outs, and commercial building retrofits.

Frequently Asked Questions

Arlington Permit Quote

Get a permit package tailored to Arlington's specific requirements.

Common Permit Problems in Arlington

Browse guides for ADUs, after-the-fact permits, decks, and more — with complete permit packages.

Led by Licensed Engineers

Ready to Permit in Arlington?

Our team knows Arlington building codes and permit requirements. Call (888) 257-8440 for a free quote.