Arlington, Virginia Building Permits
Get all the information you need for building permits in Arlington, Virginia. Learn about current code adoptions, fees, and the local permit application process.
Wind
ASCE 7 basic wind speed: 115 mph
Snow Load
Ground snow load: 25 psf
Flood
Portions of Arlington are located in 100-year flood zones; flood-resistant construction standards apply.
Earthquake
Seismic Design Category B
Wildfire
Very low risk; focus is primarily on building code compliance regarding fire resistance.
Building Department
Arlington County Inspection Services Division
Approval Timeline
Residential permits take 10-15 business days; commercial permits often require 30-45 business days for initial review.
Common Requirements
Plats of survey, detailed construction drawings, energy code compliance documentation, and completed permit application forms.
Zoning Information
Arlington uses a complex zoning ordinance with various 'R' (residential) and 'C' (commercial) districts, frequently involving site plan requirements for larger developments.
Permit Costs
Fees are based on a combination of fixed administrative costs and variable charges tied to project value and the volume of inspections required.
Engineering Requirements
Structural, mechanical, electrical, and plumbing engineering stamps are required for all commercial work and residential structural changes.
Local Code Adoption
2018 Virginia Uniform Statewide Building Code
Typical Projects
High-density residential development, kitchen remodels, basement dig-outs, and commercial building retrofits.